FortisAlberta: delivery charges and town fees

What FortisAlberta charges to deliver electricity in Alberta, and the fee each town adds to your bill, with dates and sources.

The short answer

FortisAlberta delivers electricity. Its delivery charges are the same whichever retailer you choose. Each town sets its own municipal fee.

What FortisAlberta charges to deliver electricity

ChargeAmountEffective fromSource
Balancing pool rider0.1198¢ per kWh (from 1 January 2026)1 January 2026FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026)
Base Transmission Adjustment Rider-0.59% (from 1 January 2026)1 January 2026FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026)
Fixed delivery chargeC$1.034442 per day (from 1 January 2026)1 January 2026FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026)
Quarterly transmission adjustment rider0.0155¢ per kWh (1 October 2026 to 31 December 2026)1 October 2026AUC Disposition 31030-D01-2026 (September 11, 2026), Appendix 1 - FortisAlberta Inc. 2026 Q4 QTAR filing, Rider Schedules (Quarterly Transmission Adjustment Rider)
Transmission charge4.2560¢ per kWh (from 1 January 2026)1 January 2026FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026)
Variable delivery charge3.3477¢ per kWh (from 1 January 2026)1 January 2026FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026)

Towns and areas FortisAlberta serves

FortisAlberta delivers electricity in 251 Alberta municipalities. We have the town fee for 251 of them.

MunicipalityDefault supplierTown feesAdds about
AcmeEPCOR Energy Alberta
Municipal assessment rider: 1.45% (from 1 July 2026) [source]
Municipal franchise fee: 3% (from 1 July 2013) [source]
Not worked out
AirdrieEPCOR Energy Alberta
Municipal assessment rider: 1.04% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 April 2021) [source]
$17.03 a month
Alberta BeachEPCOR Energy Alberta
Municipal assessment rider: 1.71% (from 1 July 2026) [source]
Municipal franchise fee: 8% (from 1 January 2021) [source]
Not worked out
Alexander First NationEPCOR Energy Alberta
Municipal assessment rider: 1.71% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Alexis Nakota Sioux NationEPCOR Energy Alberta
Municipal assessment rider: 1.57% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
AlixEPCOR Energy Alberta
Municipal assessment rider: 0.95% (from 1 July 2026) [source]
Municipal franchise fee: 8.50% (from 1 January 2019) [source]
Not worked out
AmiskEPCOR Energy Alberta
Municipal assessment rider: 1.54% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2014) [source]
Not worked out
Argentia BeachEPCOR Energy Alberta
Municipal assessment rider: 0.63% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2017) [source]
Not worked out
ArrowwoodEPCOR Energy Alberta
Municipal assessment rider: 1.21% (from 1 July 2026) [source]
Municipal franchise fee: 12% (from 1 July 2015) [source]
Not worked out
AthabascaEPCOR Energy Alberta
Municipal assessment rider: 1.65% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2024) [source]
$17.52 a month
Athabasca CountyEPCOR Energy Alberta
Municipal assessment rider: 0.54% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
BanffEPCOR Energy Alberta
Municipal assessment rider: 0.47% (from 1 July 2026) [source]
Municipal franchise fee: 8% (from 1 January 2025) [source]
$6.86 a month
BarnwellEPCOR Energy Alberta
Municipal assessment rider: 0.95% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 January 2025) [source]
Not worked out
BaronsEPCOR Energy Alberta
Municipal assessment rider: 0.92% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 April 2015) [source]
Not worked out
BarrheadEPCOR Energy Alberta
Municipal assessment rider: 1.49% (from 1 July 2026) [source]
Municipal franchise fee: 16% (from 1 April 2026) [source]
$14.16 a month
BashawEPCOR Energy Alberta
Municipal assessment rider: 0.95% (from 1 July 2026) [source]
Municipal franchise fee: 2% (from 1 January 2021) [source]
$2.39 a month
BassanoEPCOR Energy Alberta
Municipal assessment rider: 1.47% (from 1 July 2026) [source]
Municipal franchise fee: 14.40% (from 1 January 2019) [source]
$12.85 a month
BawlfEPCOR Energy Alberta
Municipal assessment rider: 1.33% (from 1 July 2026) [source]
Municipal franchise fee: 9% (from 1 January 2025) [source]
Not worked out
BeaumontEPCOR Energy Alberta
Municipal assessment rider: 1.29% (from 1 July 2026) [source]
Municipal franchise fee: 17.25% (from 1 January 2020) [source]
$15.01 a month
Beaver CountyEPCOR Energy Alberta
Municipal assessment rider: 1.20% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Beaver Lake Cree NationEPCOR Energy Alberta
Municipal assessment rider: 1.46% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
BeisekerEPCOR Energy Alberta
Municipal assessment rider: 1.25% (from 1 July 2026) [source]
Municipal franchise fee: 3.50% (from 1 January 2019) [source]
Not worked out
BentleyEPCOR Energy Alberta
Municipal assessment rider: 1.64% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2019) [source]
$9.42 a month
Betula BeachEPCOR Energy Alberta
Municipal assessment rider: 1.22% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2017) [source]
Not worked out
Big Lakes CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.41% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Bighorn No. 8EPCOR Energy Alberta
Municipal assessment rider: 0.62% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Bigstone Cree NationDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 1.02% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Birch CoveEPCOR Energy Alberta
Municipal assessment rider: 2.94% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
BirchcliffEPCOR Energy Alberta
Municipal assessment rider: 0.48% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Bittern LakeEPCOR Energy Alberta
Municipal assessment rider: 2.11% (from 1 July 2026) [source]
Municipal franchise fee: 9% (from 1 January 2026) [source]
Not worked out
BlackfaldsEPCOR Energy Alberta
Municipal assessment rider: 1.46% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 October 2013) [source]
$17.37 a month
BoardDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.57% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Bon AccordEPCOR Energy Alberta
Municipal assessment rider: 2.76% (from 1 July 2026) [source]
Municipal franchise fee: 19% (from 1 January 2022) [source]
$17.61 a month
BondissEPCOR Energy Alberta
Municipal assessment rider: 0.46% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Bonnyville No. 87Direct Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 1.05% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Bow IslandEPCOR Energy Alberta
Municipal assessment rider: 0.90% (from 1 July 2026) [source]
Municipal franchise fee: 17% (from 1 January 2024) [source]
$14.49 a month
BowdenEPCOR Energy Alberta
Municipal assessment rider: 1.35% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 January 2017) [source]
$13.23 a month
BoyleEPCOR Energy Alberta
Municipal assessment rider: 2.17% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2021) [source]
Not worked out
Brazeau CountyEPCOR Energy Alberta
Municipal assessment rider: 1.08% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
BretonEPCOR Energy Alberta
Municipal assessment rider: 1.79% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2015) [source]
Not worked out
BrooksEPCOR Energy Alberta
Municipal assessment rider: 1.45% (from 1 July 2026) [source]
Municipal franchise fee: 17% (from 1 April 2026) [source]
$14.93 a month
BruderheimEPCOR Energy Alberta
Municipal assessment rider: 1.69% (from 1 July 2026) [source]
Municipal franchise fee: 4% (from 1 April 2024) [source]
$4.61 a month
Buffalo Lake Metis SettlementEPCOR Energy Alberta
Municipal assessment rider: 3.76% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Burnstick LakeEPCOR Energy Alberta
Municipal assessment rider: 0.35% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
CalgaryENMAX Energy, EPCOR Energy Alberta
Municipal assessment rider: 0.71% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
CalmarEPCOR Energy Alberta
Municipal assessment rider: 1.58% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 July 2013) [source]
$17.47 a month
CamroseEPCOR Energy Alberta
Municipal assessment rider: 1.31% (from 1 July 2026) [source]
Municipal franchise fee: 18% (from 1 April 2025) [source]
$15.63 a month
Camrose CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 1.22% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
CanmoreEPCOR Energy Alberta
Municipal assessment rider: 0.74% (from 1 July 2026) [source]
Municipal franchise fee: 18% (from 1 January 2026) [source]
$15.17 a month
Cardston CountyEPCOR Energy Alberta
Municipal assessment rider: 0.71% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
CarmangayEPCOR Energy Alberta
Municipal assessment rider: 0.88% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 January 2021) [source]
Not worked out
CarolineEPCOR Energy Alberta
Municipal assessment rider: 0.78% (from 1 July 2026) [source]
Municipal franchise fee: 12% (from 1 January 2021) [source]
Not worked out
CarstairsEPCOR Energy Alberta
Municipal assessment rider: 1.24% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2015) [source]
$9.10 a month
Castle IslandEPCOR Energy Alberta
Municipal assessment rider: 3.93% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
ChampionEPCOR Energy Alberta
Municipal assessment rider: 1.21% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 April 2015) [source]
Not worked out
ChauvinEPCOR Energy Alberta
Municipal assessment rider: 2.59% (from 1 July 2026) [source]
Municipal franchise fee: 11% (from 1 January 2016) [source]
Not worked out
ChestermereEPCOR Energy Alberta
Municipal assessment rider: 0.96% (from 1 July 2026) [source]
Municipal franchise fee: 11.50% (from 1 January 2014) [source]
$10.09 a month
ChipmanEPCOR Energy Alberta
Municipal assessment rider: 2.53% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
ClaresholmEPCOR Energy Alberta
Municipal assessment rider: 1.16% (from 1 July 2026) [source]
Municipal franchise fee: 9% (from 1 January 2026) [source]
$8.22 a month
Clearwater CountyEPCOR Energy Alberta
Municipal assessment rider: 0.78% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
CliveEPCOR Energy Alberta
Municipal assessment rider: 1.35% (from 1 July 2026) [source]
Municipal franchise fee: 11% (from 1 January 2023) [source]
Not worked out
ClydeEPCOR Energy Alberta
Municipal assessment rider: 2.93% (from 1 July 2026) [source]
Municipal franchise fee: 18% (from 1 January 2024) [source]
Not worked out
CoaldaleEPCOR Energy Alberta
Municipal assessment rider: 0.91% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 April 2025) [source]
$16.92 a month
CoalhurstEPCOR Energy Alberta
Municipal assessment rider: 1.48% (from 1 July 2026) [source]
Municipal franchise fee: 7.5% (from 1 January 2023) [source]
$7.27 a month
CochraneEPCOR Energy Alberta
Municipal assessment rider: 1.03% (from 1 July 2026) [source]
Municipal franchise fee: 17% (from 1 January 2020) [source]
$14.59 a month
County of Barrhead No. 11EPCOR Energy Alberta
Municipal assessment rider: 0.51% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of Forty Mile No. 8EPCOR Energy Alberta
Municipal assessment rider: 0.66% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of Minburn No. 27Direct Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 1.49% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of NewellEPCOR Energy Alberta
Municipal assessment rider: 0.43% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of Paintearth No. 18Direct Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 4.04% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of Stettler No. 6Direct Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.52% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of Vermilion RiverDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.19% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of Warner No. 5EPCOR Energy Alberta
Municipal assessment rider: 0.96% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
County of Wetaskiwin No. 10EPCOR Energy Alberta
Municipal assessment rider: 1.51% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
CouttsEPCOR Energy Alberta
Municipal assessment rider: 2.50% (from 1 July 2026) [source]
Municipal franchise fee: 3% (from 1 January 2017) [source]
Not worked out
CowleyEPCOR Energy Alberta
Municipal assessment rider: 0.74% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 January 2016) [source]
Not worked out
CremonaEPCOR Energy Alberta
Municipal assessment rider: 1.40% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2016) [source]
Not worked out
CrossfieldEPCOR Energy Alberta
Municipal assessment rider: 0.94% (from 1 July 2026) [source]
Municipal franchise fee: 17% (from 1 January 2023) [source]
$14.52 a month
Crystal SpringsEPCOR Energy Alberta
Municipal assessment rider: 0.46% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
Cypress CountyEPCOR Energy Alberta
Municipal assessment rider: 0.48% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
CzarEPCOR Energy Alberta
Municipal assessment rider: 1.01% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 October 2013) [source]
Not worked out
DayslandEPCOR Energy Alberta
Municipal assessment rider: 2.30% (from 1 July 2026) [source]
Municipal franchise fee: 12% (from 1 January 2026) [source]
Not worked out
DevonEPCOR Energy Alberta
Municipal assessment rider: 1.26% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2026) [source]
Not worked out
Diamond ValleyEPCOR Energy Alberta
Municipal assessment rider: 3.25% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2023) [source]
$10.72 a month
DidsburyEPCOR Energy Alberta
Municipal assessment rider: 1.17% (from 1 July 2026) [source]
Municipal franchise fee: 17% (from 1 January 2016) [source]
$14.71 a month
Drayton ValleyEPCOR Energy Alberta
Municipal assessment rider: 1.33% (from 1 July 2026) [source]
Municipal franchise fee: 13.40% (from 1 January 2025) [source]
$11.92 a month
DuchessEPCOR Energy Alberta
Municipal assessment rider: 1.28% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 January 2018) [source]
Not worked out
EckvilleEPCOR Energy Alberta
Municipal assessment rider: 1.60% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2015) [source]
$9.39 a month
EdbergEPCOR Energy Alberta
Municipal assessment rider: 1.62% (from 1 July 2026) [source]
Municipal franchise fee: 13% (from 1 January 2021) [source]
Not worked out
EdgertonEPCOR Energy Alberta
Municipal assessment rider: 2.65% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 January 2022) [source]
Not worked out
EdmontonEPCOR Energy Alberta
Municipal assessment rider: 0.69% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
EdsonEPCOR Energy Alberta
Municipal assessment rider: 1.33% (from 1 July 2026) [source]
Municipal franchise fee: 6.70% (from 1 January 2026) [source]
$6.50 a month
Enoch Cree Nation #440EPCOR Energy Alberta
Municipal assessment rider: 1.46% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Ermineskin TribeEPCOR Energy Alberta
Municipal assessment rider: 1.45% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
FerintoshEPCOR Energy Alberta
Municipal assessment rider: 1.22% (from 1 July 2026) [source]
Municipal franchise fee: 11% (from 1 January 2016) [source]
Not worked out
Flagstaff CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.41% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Foothills CountyEPCOR Energy Alberta
Municipal assessment rider: 0.56% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
ForemostEPCOR Energy Alberta
Municipal assessment rider: 0.83% (from 1 July 2026) [source]
Municipal franchise fee: 7% (from 1 January 2016) [source]
Not worked out
Fort MacleodEPCOR Energy Alberta
Municipal assessment rider: 1.47% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 October 2018) [source]
$13.33 a month
Fort SaskatchewanEPCOR Energy Alberta
Municipal assessment rider: 0.86% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 October 2013) [source]
$0.70 a month
Ghost LakeEPCOR Energy Alberta
Municipal assessment rider: 0.50% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
GibbonsEPCOR Energy Alberta
Municipal assessment rider: 1.52% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2013) [source]
$9.32 a month
GlenwoodEPCOR Energy Alberta
Municipal assessment rider: 1.60% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 April 2022) [source]
Not worked out
Golden DaysEPCOR Energy Alberta
Municipal assessment rider: 0.75% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2017) [source]
Not worked out
GrandviewEPCOR Energy Alberta
Municipal assessment rider: 0.71% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
GranumEPCOR Energy Alberta
Municipal assessment rider: 0.74% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 February 2024) [source]
Not worked out
Greenview No. 16Direct Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.12% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Gull LakeEPCOR Energy Alberta
Municipal assessment rider: -0.30% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
Half Moon BayEPCOR Energy Alberta
Municipal assessment rider: 0.48% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2021) [source]
Not worked out
HardistyEPCOR Energy Alberta
Municipal assessment rider: 1.44% (from 1 July 2026) [source]
Municipal franchise fee: 9.50% (from 1 January 2021) [source]
$8.85 a month
Hay LakesEPCOR Energy Alberta
Municipal assessment rider: 1.44% (from 1 July 2026) [source]
Municipal franchise fee: 9% (from 1 January 2021) [source]
Not worked out
High RiverEPCOR Energy Alberta
Municipal assessment rider: 0.99% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 July 2015) [source]
$16.99 a month
Hill SpringEPCOR Energy Alberta
Municipal assessment rider: 1.67% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 January 2014) [source]
Not worked out
HintonEPCOR Energy Alberta
Municipal assessment rider: 0.79% (from 1 July 2026) [source]
Municipal franchise fee: 11.73% (from 1 January 2022) [source]
$10.13 a month
HoldenEPCOR Energy Alberta
Municipal assessment rider: 2.17% (from 1 July 2026) [source]
Municipal franchise fee: 4% (from 1 January 2016) [source]
Not worked out
HughendenEPCOR Energy Alberta
Municipal assessment rider: 1.26% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 January 2016) [source]
Not worked out
HussarEPCOR Energy Alberta
Municipal assessment rider: 0.92% (from 1 July 2026) [source]
Municipal franchise fee: 12.50% (from 1 January 2017) [source]
Not worked out
InnisfailEPCOR Energy Alberta
Municipal assessment rider: 0.69% (from 1 July 2026) [source]
Municipal franchise fee: 18% (from 1 April 2025) [source]
$15.13 a month
IrmaEPCOR Energy Alberta
Municipal assessment rider: 1.43% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2015) [source]
Not worked out
IrricanaEPCOR Energy Alberta
Municipal assessment rider: 1.56% (from 1 July 2026) [source]
Municipal franchise fee: 8% (from 1 May 2023) [source]
$7.74 a month
Island LakeEPCOR Energy Alberta
Municipal assessment rider: -0.16% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
Island Lake SouthEPCOR Energy Alberta
Municipal assessment rider: 1.75% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Itaska BeachEPCOR Energy Alberta
Municipal assessment rider: 0.92% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 October 2017) [source]
Not worked out
Jarvis BayEPCOR Energy Alberta
Municipal assessment rider: 0.30% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 8 October 2015) [source]
Not worked out
Kananaskis Improvement DistrictEPCOR Energy Alberta
Municipal assessment rider: 0.24% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
KapasiwinEPCOR Energy Alberta
Municipal assessment rider: 2.48% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 April 2018) [source]
Not worked out
Kikino Metis SettlementEPCOR Energy Alberta
Municipal assessment rider: 0.95% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
KillamEPCOR Energy Alberta
Municipal assessment rider: 2.05% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2024) [source]
Not worked out
Kneehill CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.89% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Lac La Biche CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.49% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Lac Ste. Anne CountyEPCOR Energy Alberta
Municipal assessment rider: 1.87% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
LacombeEPCOR Energy Alberta
Municipal assessment rider: 1.06% (from 1 July 2026) [source]
Municipal franchise fee: 17.63% (from 1 January 2024) [source]
$15.13 a month
Lacombe CountyEPCOR Energy Alberta
Municipal assessment rider: 0.45% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
LakeviewEPCOR Energy Alberta
Municipal assessment rider: 2.24% (from 1 July 2026) [source]
Municipal franchise fee: 2% (from 1 January 2016) [source]
Not worked out
LamontEPCOR Energy Alberta
Municipal assessment rider: 1.75% (from 1 July 2026) [source]
Municipal franchise fee: 7.50% (from 1 January 2020) [source]
$7.49 a month
Lamont CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.39% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
LarkspurEPCOR Energy Alberta
Municipal assessment rider: 0.92% (from 1 July 2026) [source]
Municipal franchise fee: 3% (from 1 April 2020) [source]
Not worked out
LeducEPCOR Energy Alberta
Municipal assessment rider: 1.03% (from 1 July 2026) [source]
Municipal franchise fee: 18% (from 1 May 2026) [source]
$15.40 a month
Leduc CountyEPCOR Energy Alberta
Municipal assessment rider: 0.39% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Lesser Slave River No. 124Direct Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.12% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Lethbridge CountyEPCOR Energy Alberta
Municipal assessment rider: 0.41% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 April 2026) [source]
Not worked out
LomondEPCOR Energy Alberta
Municipal assessment rider: 2.77% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2026) [source]
Not worked out
LongviewEPCOR Energy Alberta
Municipal assessment rider: 1.17% (from 1 July 2026) [source]
Municipal franchise fee: 17% (from 1 January 2017) [source]
Not worked out
LougheedEPCOR Energy Alberta
Municipal assessment rider: 1.61% (from 1 July 2026) [source]
Municipal franchise fee: 9% (from 1 January 2026) [source]
Not worked out
Ma-Me-O BeachEPCOR Energy Alberta
Municipal assessment rider: 1.05% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
MagrathEPCOR Energy Alberta
Municipal assessment rider: 1.43% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 January 2023) [source]
$13.30 a month
MayerthorpeEPCOR Energy Alberta
Municipal assessment rider: 2.85% (from 1 July 2026) [source]
Municipal franchise fee: 14.75% (from 1 January 2025) [source]
$14.25 a month
Mewatha BeachEPCOR Energy Alberta
Municipal assessment rider: 0.88% (from 1 July 2026) [source]
Municipal franchise fee: 2% (from 1 October 2016) [source]
Not worked out
Milk RiverEPCOR Energy Alberta
Municipal assessment rider: 2.26% (from 1 July 2026) [source]
Municipal franchise fee: 12% (from 1 January 2017) [source]
$11.54 a month
MilletEPCOR Energy Alberta
Municipal assessment rider: 1.56% (from 1 July 2026) [source]
Municipal franchise fee: 19% (from 1 January 2026) [source]
$16.64 a month
MiloEPCOR Energy Alberta
Municipal assessment rider: -0.52% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2017) [source]
Not worked out
MorinvilleEPCOR Energy Alberta
Municipal assessment rider: 1.89% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 July 2013) [source]
$17.72 a month
Mountain View CountyEPCOR Energy Alberta
Municipal assessment rider: 0.63% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Municipality of Crowsnest PassEPCOR Energy Alberta
Municipal assessment rider: 2.37% (from 1 July 2026) [source]
Municipal franchise fee: 16% (from 1 January 2016) [source]
$14.87 a month
Nakamun ParkEPCOR Energy Alberta
Municipal assessment rider: 3.15% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 October 2013) [source]
Not worked out
NantonEPCOR Energy Alberta
Municipal assessment rider: 1.19% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2026) [source]
$9.06 a month
New NorwayEPCOR Energy Alberta
Municipal assessment rider: 1.22% (from 1 July 2026) [source]
Municipal franchise fee: 6% (from 1 January 2009) [source]
Not worked out
No. 04 (Waterton)EPCOR Energy Alberta
Municipal assessment rider: 0.43% (from 1 July 2026) [source]
Municipal franchise fee: 8% (from 1 October 2018) [source]
Not worked out
No. 09 (Banff)EPCOR Energy Alberta
Municipal assessment rider: 0.14% (from 1 July 2026) [source]
Municipal franchise fee: 8% (from 1 January 2026) [source]
Not worked out
No. 13 (Elk Island)EPCOR Energy Alberta
Municipal assessment rider: 0.18% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
NoblefordEPCOR Energy Alberta
Municipal assessment rider: 0.77% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 January 2023) [source]
$4.67 a month
NorglenwoldEPCOR Energy Alberta
Municipal assessment rider: 0.33% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 January 2015) [source]
Not worked out
Norris BeachEPCOR Energy Alberta
Municipal assessment rider: 0.85% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
O'Chiese First NationEPCOR Energy Alberta
Municipal assessment rider: 0.81% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
OkotoksEPCOR Energy Alberta
Municipal assessment rider: 0.92% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2021) [source]
$16.93 a month
OldsEPCOR Energy Alberta
Municipal assessment rider: 1.22% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2025) [source]
$17.18 a month
OnowayEPCOR Energy Alberta
Municipal assessment rider: 2.01% (from 1 July 2026) [source]
Municipal franchise fee: 10.50% (from 1 January 2024) [source]
$10.13 a month
Opportunity No. 17Direct Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 3.40% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Parkland BeachEPCOR Energy Alberta
Municipal assessment rider: 0.30% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2015) [source]
Not worked out
Parkland CountyEPCOR Energy Alberta
Municipal assessment rider: 0.67% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Paul First NationEPCOR Energy Alberta
Municipal assessment rider: 1.23% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
PenholdEPCOR Energy Alberta
Municipal assessment rider: 1.56% (from 1 July 2026) [source]
Municipal franchise fee: 19% (from 1 January 2014) [source]
$16.64 a month
Picture ButteEPCOR Energy Alberta
Municipal assessment rider: 1.03% (from 1 July 2026) [source]
Municipal franchise fee: 11% (from 1 January 2022) [source]
$9.74 a month
Pincher CreekEPCOR Energy Alberta
Municipal assessment rider: 1.00% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2024) [source]
$17.00 a month
Pincher Creek No. 9EPCOR Energy Alberta
Municipal assessment rider: 0.97% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Point AlisonEPCOR Energy Alberta
Municipal assessment rider: 0.51% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 23 January 2017) [source]
Not worked out
Ponoka CountyEPCOR Energy Alberta
Municipal assessment rider: 0.80% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Poplar BayEPCOR Energy Alberta
Municipal assessment rider: 0.53% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
ProvostEPCOR Energy Alberta
Municipal assessment rider: 1.99% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2015) [source]
$17.80 a month
Provost No. 52EPCOR Energy Alberta
Municipal assessment rider: 0.46% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Ranchland No. 66EPCOR Energy Alberta
Municipal assessment rider: 1.57% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
RaymondEPCOR Energy Alberta
Municipal assessment rider: 1.38% (from 1 July 2026) [source]
Municipal franchise fee: 16% (from 1 January 2022) [source]
$14.07 a month
Red Deer CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.95% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
RedwaterEPCOR Energy Alberta
Municipal assessment rider: 1.48% (from 1 July 2026) [source]
Municipal franchise fee: 12% (from 1 April 2026) [source]
Not worked out
Regional Municipality of Wood BuffaloDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.22% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
RimbeyEPCOR Energy Alberta
Municipal assessment rider: 1.17% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2022) [source]
$17.14 a month
Rocky Mountain HouseEPCOR Energy Alberta
Municipal assessment rider: 1.75% (from 1 July 2026) [source]
Municipal franchise fee: 16.80% (from 1 January 2025) [source]
$15.01 a month
Rocky View CountyEPCOR Energy Alberta
Municipal assessment rider: 0.49% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
RockyfordEPCOR Energy Alberta
Municipal assessment rider: 1.13% (from 1 July 2026) [source]
Municipal franchise fee: 7% (from 1 January 2024) [source]
Not worked out
RosemaryEPCOR Energy Alberta
Municipal assessment rider: 1.75% (from 1 July 2026) [source]
Municipal franchise fee: 15.50% (from 1 January 2023) [source]
Not worked out
Ross HavenEPCOR Energy Alberta
Municipal assessment rider: 1.50% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
RyleyEPCOR Energy Alberta
Municipal assessment rider: 2.30% (from 1 July 2026) [source]
Municipal franchise fee: 3% (from 1 January 2016) [source]
Not worked out
Sandy BeachEPCOR Energy Alberta
Municipal assessment rider: 1.65% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Seba BeachEPCOR Energy Alberta
Municipal assessment rider: 0.89% (from 1 July 2026) [source]
Municipal franchise fee: 4% (from 1 January 2014) [source]
Not worked out
SedgewickEPCOR Energy Alberta
Municipal assessment rider: 1.47% (from 1 July 2026) [source]
Municipal franchise fee: 13% (from 1 January 2026) [source]
Not worked out
Siksika NationEPCOR Energy Alberta
Municipal assessment rider: 1.58% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Silver BeachEPCOR Energy Alberta
Municipal assessment rider: 0.39% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Silver SandsEPCOR Energy Alberta
Municipal assessment rider: 3.09% (from 1 July 2026) [source]
Municipal franchise fee: 3% (from 1 January 2018) [source]
Not worked out
Smoky Lake CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 34.12% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
South BaptisteEPCOR Energy Alberta
Municipal assessment rider: 0.19% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2005) [source]
Not worked out
South ViewEPCOR Energy Alberta
Municipal assessment rider: 3.12% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 January 2026) [source]
Not worked out
Spring LakeEPCOR Energy Alberta
Municipal assessment rider: 1.40% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 April 2025) [source]
Not worked out
Spruce GroveEPCOR Energy Alberta
Municipal assessment rider: 1.36% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2016) [source]
$17.29 a month
St. AlbertEPCOR Energy Alberta
Municipal assessment rider: 1.52% (from 1 July 2026) [source]
Municipal franchise fee: 15% (from 1 January 2023) [source]
$13.37 a month
StandardEPCOR Energy Alberta
Municipal assessment rider: 1.23% (from 1 July 2026) [source]
Municipal franchise fee: 4% (from 1 April 2024) [source]
Not worked out
StavelyEPCOR Energy Alberta
Municipal assessment rider: 0.74% (from 1 July 2026) [source]
Municipal franchise fee: 6% (from 1 January 2021) [source]
$5.46 a month
StirlingEPCOR Energy Alberta
Municipal assessment rider: 1.30% (from 1 July 2026) [source]
Municipal franchise fee: 12% (from 1 January 2019) [source]
Not worked out
Stoney (Bearspaw) First NationEPCOR Energy Alberta
Municipal assessment rider: 0.72% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Stony PlainEPCOR Energy Alberta
Municipal assessment rider: 1.32% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2013) [source]
$17.26 a month
Strathcona County (Sherwood Park)EPCOR Energy Alberta
Municipal assessment rider: 0.85% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2026) [source]
$0.69 a month
StrathmoreEPCOR Energy Alberta
Municipal assessment rider: 1.07% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 July 2020) [source]
$17.05 a month
StromeEPCOR Energy Alberta
Municipal assessment rider: 0.41% (from 1 July 2026) [source]
Municipal franchise fee: 9% (from 1 January 2022) [source]
Not worked out
Sturgeon CountyEPCOR Energy Alberta
Municipal assessment rider: 0.54% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Sunbreaker CoveEPCOR Energy Alberta
Municipal assessment rider: 0.48% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Sunchild First NationEPCOR Energy Alberta
Municipal assessment rider: 0.39% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Sundance BeachEPCOR Energy Alberta
Municipal assessment rider: 0.69% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
SundreEPCOR Energy Alberta
Municipal assessment rider: 1.18% (from 1 July 2026) [source]
Municipal franchise fee: 12% (from 1 January 2024) [source]
Not worked out
Sunrise BeachEPCOR Energy Alberta
Municipal assessment rider: 3.44% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2018) [source]
Not worked out
Sunset BeachEPCOR Energy Alberta
Municipal assessment rider: 1.00% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Sunset PointEPCOR Energy Alberta
Municipal assessment rider: -0.29% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2017) [source]
Not worked out
Sylvan LakeEPCOR Energy Alberta
Municipal assessment rider: 1.62% (from 1 July 2026) [source]
Municipal franchise fee: 18% (from 1 January 2023) [source]
$15.88 a month
TaberEPCOR Energy Alberta
Municipal assessment rider: 0.77% (from 1 July 2026) [source]
Municipal franchise fee: 18% (from 1 July 2020) [source]
$15.19 a month
TaberEPCOR Energy Alberta
Municipal assessment rider: 0.66% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Thorhild CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 1.38% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
ThorsbyEPCOR Energy Alberta
Municipal assessment rider: 2.37% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 January 2014) [source]
$18.11 a month
TofieldEPCOR Energy Alberta
Municipal assessment rider: 1.97% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 January 2015) [source]
$5.64 a month
Tsuut'ina NationEPCOR Energy Alberta
Municipal assessment rider: 3.70% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Val QuentinEPCOR Energy Alberta
Municipal assessment rider: 1.88% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 January 2016) [source]
Not worked out
VauxhallEPCOR Energy Alberta
Municipal assessment rider: 1.21% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2026) [source]
$9.07 a month
VikingEPCOR Energy Alberta
Municipal assessment rider: 2.22% (from 1 July 2026) [source]
Municipal franchise fee: 8% (from 1 January 2013) [source]
$8.27 a month
VulcanEPCOR Energy Alberta
Municipal assessment rider: 1.11% (from 1 July 2026) [source]
Municipal franchise fee: 20% (from 1 October 2013) [source]
$17.09 a month
Vulcan CountyEPCOR Energy Alberta
Municipal assessment rider: 0.70% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
WabamunEPCOR Energy Alberta
Municipal assessment rider: 0.67% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2017) [source]
Not worked out
WainwrightEPCOR Energy Alberta
Municipal assessment rider: 1.18% (from 1 July 2026) [source]
Municipal franchise fee: 14.5% (from 1 January 2026) [source]
Not worked out
Wainwright No. 61EPCOR Energy Alberta
Municipal assessment rider: 1.20% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
WaiparousEPCOR Energy Alberta
Municipal assessment rider: 0.36% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
WarburgEPCOR Energy Alberta
Municipal assessment rider: 2.37% (from 1 July 2026) [source]
Municipal franchise fee: 10% (from 1 January 2015) [source]
Not worked out
WarnerEPCOR Energy Alberta
Municipal assessment rider: 1.90% (from 1 July 2026) [source]
Municipal franchise fee: 7% (from 1 January 2024) [source]
Not worked out
West BaptisteEPCOR Energy Alberta
Municipal assessment rider: 0.53% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
West CoveEPCOR Energy Alberta
Municipal assessment rider: 1.66% (from 1 July 2026) [source]
Municipal franchise fee: 3% (from 1 January 2025) [source]
Not worked out
WestlockEPCOR Energy Alberta
Municipal assessment rider: 1.86% (from 1 July 2026) [source]
Municipal franchise fee: 16.25% (from 1 January 2024) [source]
$14.66 a month
Westlock CountyEPCOR Energy Alberta
Municipal assessment rider: 1.29% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
WetaskiwinEPCOR Energy Alberta
Municipal assessment rider: 2.06% (from 1 July 2026) [source]
Municipal franchise fee: 17% (from 1 January 2026) [source]
$15.43 a month
Wheatland CountyDirect Energy Regulated Services, EPCOR Energy Alberta
Municipal assessment rider: 0.52% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Whispering HillsEPCOR Energy Alberta
Municipal assessment rider: 0.61% (from 1 July 2026) [source]
Municipal franchise fee: 5% (from 1 October 2016) [source]
Not worked out
WhitecourtEPCOR Energy Alberta
Municipal assessment rider: 1.18% (from 1 July 2026) [source]
Municipal franchise fee: 7.09% (from 1 January 2026) [source]
$6.69 a month
Willow Creek No. 26EPCOR Energy Alberta
Municipal assessment rider: 0.74% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Woodlands CountyEPCOR Energy Alberta
Municipal assessment rider: 0.73% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
Yellowhead CountyEPCOR Energy Alberta
Municipal assessment rider: 0.39% (from 1 July 2026) [source]
Municipal franchise fee: 0% (from 1 May 2026) [source]
Not worked out
YellowstoneEPCOR Energy Alberta
Municipal assessment rider: 0.57% (from 1 July 2026) [source]
Municipal franchise fee: 13% (from 1 January 2025) [source]
Not worked out

Monthly estimates use typical usage of 600 kWh of electricity. They use current default rates and delivery charges, with GST included.

Town fees across Alberta · Who delivers power and gas in Alberta

Highest and lowest

Municipal assessment rider

Highest

  • Smoky Lake County: 34.12% (from 1 July 2026) · Source
  • Paintearth County: 4.04% (from 1 July 2026) · Source
  • Castle Island: 3.93% (from 1 July 2026) · Source

Lowest

  • Ponoka: -0.68% (from 1 July 2026) · Source
  • Milo: -0.52% (from 1 July 2026) · Source
  • Gull Lake: -0.30% (from 1 July 2026) · Source

Municipal franchise fee

Highest

  • Airdrie: 20% (from 1 April 2021) · Source
  • Athabasca: 20% (from 1 January 2024) · Source
  • Blackfalds: 20% (from 1 October 2013) · Source

Lowest

  • Alexander First Nation: 0% (from 1 May 2026) · Source
  • Alexis Nakota Sioux Nation: 0% (from 1 May 2026) · Source
  • Amisk: 0% (from 1 January 2014) · Source

How these charges reach your bill

Your retailer includes delivery charges and municipal fees on your energy bill.

In the FortisAlberta area, each municipality's franchise fee is a percentage added to the delivery tariff (distribution and transmission charges, not riders) for every home in the municipality. FortisAlberta bills it to your retailer and pays it to the municipality. (from 1 May 2026) [source]

Questions people ask

What is a delivery charge?

It pays the delivery company to bring energy to your home through wires or pipes and to maintain that system.

Why does the town fee differ from town to town?

Municipalities set their own fees for the delivery company to use municipal land and infrastructure.

Does switching retailer change delivery charges?

No. The delivery company and municipal fees stay the same whichever retailer you choose.

Sources

Are you on the right energy plan?

Send your bills as PDFs. We compare the plans available at your address, and you decide. Free during our launch.

Check my bills, free
  • We never phone you