A 36,000 Btu/h central unit costs about 55 cents/hour in Calgary and 55 cents/hour in Edmonton. An 8,000 Btu/h window unit costs about 10 and 10 cents/hour. Examples use the default rate with delivery, town fees and GST. Natural Resources Canada explains the watts method. Your plan’s energy price will differ. Heat waves raise kWh, not the default rate.
Air conditioner running costs in Alberta
Air conditioner running costs in Alberta depend on power and hours. Your town’s charges also matter. A guide published by Natural Resources Canada explains the power input. The table prices chosen loads on the default rate. Delivery, town fees and GST are included. Your plan’s energy price will differ.
For illustration
Each cooling month means 6 hours a day for 30 days, or 180 hours. The fan runs 8 hours a day for 30 days. Energy use is kW × hours. These are chosen examples, not a weather forecast. They do not predict a typical July.
- Central air example: 36,000 Btu/h at SEER 2 13.4 (read 30 October 2026) [source] gives about 2.69 kW. The hourly load is 2.69 × 1 = 2.69 kWh. The month is 2.69 × 180 = 484.2 kWh.
- Older central air example: 36 000 Btu/h (read 30 October 2026) [source] at SEER 10.0 (read 30 October 2026) [source] is from NRCan’s older guide. Its input is 3.6 kW. The month is 3.6 × 180 = 648 kWh.
- Window example: 8,000 Btu/h at CEER 16.0 (read 30 October 2026) [source] gives about 0.5 kW. The month is 0.5 × 180 = 90 kWh.
- Label example: an older window or portable unit is marked 1,000 W. It draws 1 kW. Read your label. The month is 1 × 180 = 180 kWh. The example does not assign all portable units that wattage.
- Ductless heat pump cooling example: 12,000 Btu/h at SEER 2 14.3 (read 30 October 2026) [source]. Its estimated input is about 0.84 kW. The month is 0.84 × 180 = 151.2 kWh.
- Fan example: a label marked 60 W gives 0.06 kW. The month is 0.06 × 240 = 14.4 kWh. This wattage is an example input.
| Town | Example: one hour | Example: 180 hours |
|---|---|---|
| Calgary | about $0.55 | about $98.29 |
| Edmonton | about $0.55 | about $98.78 |
| Airdrie | about $0.60 | about $108.46 |
| Beaumont | about $0.60 | about $107.49 |
| Cochrane | about $0.59 | about $107.01 |
| Fort Saskatchewan | about $0.56 | about $100.71 |
| Grande Prairie | about $0.78 | about $139.93 |
| Leduc | about $0.60 | about $107.49 |
| Okotoks | about $0.60 | about $108.46 |
| Sherwood Park | about $0.56 | about $100.71 |
| Spruce Grove | about $0.60 | about $108.46 |
| St. Albert | about $0.59 | about $106.52 |
| Stony Plain | about $0.60 | about $108.46 |
Worked out on the default electricity rate and today’s delivery charges and town fees, with GST. Your plan’s energy price will differ.
Tariffs in force on . Rounded estimates of extra use; daily charges are already on the bill.
The charges behind these numbers
- Rate of Last Resort, ENMAX Energy: 12.06¢ per kWh (1 January 2025 to 31 December 2026) [source]
- Rate of Last Resort, ENMAX Energy administration charge: C$0.4134 per day (from 1 January 2025) [source]
- Balancing pool rider: 0.1290¢ per kWh (from 1 January 2026) [source]
- Fixed delivery charge: C$0.769463 per day (from 1 January 2026) [source]
- Variable delivery charge: 1.5477¢ per kWh (from 1 January 2026) [source]
- Quarterly transmission adjustment rider: 0.0583¢ per kWh (1 October 2026 to 31 December 2026) [source]
- Transmission charge deferral rider: 0.0483¢ per kWh (1 January 2026 to 31 December 2026) [source]
- Transmission charge: 3.8996¢ per kWh (from 1 January 2026) [source]
- Local access fee in Calgary (approved for 2025 and 2026): 1.5507¢ per kWh (from 1 January 2025) [source]
- Rate of Last Resort, EPCOR Energy Alberta: 12.01¢ per kWh (1 January 2025 to 31 December 2026) [source]
- Rate of Last Resort, EPCOR Energy Alberta administration charge: C$0.230 per day (from 1 July 2026) [source]
- Fixed delivery charge: C$0.72856 per day (from 1 January 2026) [source]
- Variable delivery charge: 1.783¢ per kWh (from 1 January 2026) [source]
- Balancing pool rider: 0.130¢ per kWh (1 January 2026 to 31 December 2026) [source]
- Transmission true-up rider (Rider J): -0.016¢ per kWh (1 January 2026 to 31 December 2026) [source]
- Transmission deferral rider (Rider K): 0.103¢ per kWh (from 1 October 2026) [source]
- Transmission charge: 4.050¢ per kWh (from 1 January 2026) [source]
- Local access fee, Edmonton: 1.388¢ per kWh (from 1 January 2026) [source]
- Rate of Last Resort, EPCOR Energy Alberta administration charge: C$0.260 per day (from 1 July 2026) [source]
- Balancing pool rider: 0.1198¢ per kWh (from 1 January 2026) [source]
- Base Transmission Adjustment Rider: -0.59% (from 1 January 2026) [source]
- Fixed delivery charge: C$1.034442 per day (from 1 January 2026) [source]
- Variable delivery charge: 3.3477¢ per kWh (from 1 January 2026) [source]
- Quarterly transmission adjustment rider: 0.0155¢ per kWh (1 October 2026 to 31 December 2026) [source]
- Transmission charge: 4.2560¢ per kWh (from 1 January 2026) [source]
- Municipal franchise fee, Airdrie: 20% (from 1 April 2021) [source]
- Municipal assessment rider, Airdrie: 1.04% (from 1 July 2026) [source]
- Municipal franchise fee, Beaumont: 17.25% (from 1 January 2020) [source]
- Municipal assessment rider, Beaumont: 1.29% (from 1 July 2026) [source]
- Municipal franchise fee, Cochrane: 17% (from 1 January 2020) [source]
- Municipal assessment rider, Cochrane: 1.03% (from 1 July 2026) [source]
- Municipal franchise fee, Fort Saskatchewan: 0% (from 1 October 2013) [source]
- Municipal assessment rider, Fort Saskatchewan: 0.86% (from 1 July 2026) [source]
- Rate of Last Resort, Direct Energy Regulated Services: 12.02¢ per kWh (1 January 2025 to 31 December 2026) [source]
- Rate of Last Resort, Direct Energy Regulated Services administration charge: C$0.558 per day (1 July 2026 to 31 December 2026) [source]
- Fixed delivery charge: C$1.4125 per day (from 1 January 2026) [source]
- Variable delivery charge: 9.03¢ per kWh (from 1 January 2026) [source]
- Balancing pool rider (Rider B): 0.133¢ per kWh (1 January 2026 to 31 December 2026) [source]
- Temporary adjustment rider (Rider G): -0.212¢ per kWh (1 January 2026 to 31 December 2026) [source]
- Transmission deferral rider (Rider S): 0.068¢ per kWh (1 October 2026 to 31 December 2026) [source]
- Fixed service charge: C$0.2698 per day (from 1 January 2026) [source]
- Transmission charge: 4.79¢ per kWh (from 1 January 2026) [source]
- Municipal assessment rider (Rider A), Grande Prairie: 12.26% (from 1 April 2026) [source]
- Municipal franchise fee, Leduc: 18% (from 1 May 2026) [source]
- Municipal assessment rider, Leduc: 1.03% (from 1 July 2026) [source]
- Municipal franchise fee, Okotoks: 20% (from 1 January 2021) [source]
- Municipal assessment rider, Okotoks: 0.92% (from 1 July 2026) [source]
- Municipal franchise fee, Strathcona County (Sherwood Park): 0% (from 1 January 2026) [source]
- Municipal assessment rider, Strathcona County (Sherwood Park): 0.85% (from 1 July 2026) [source]
- Municipal franchise fee, Spruce Grove: 20% (from 1 January 2016) [source]
- Municipal assessment rider, Spruce Grove: 1.36% (from 1 July 2026) [source]
- Municipal franchise fee, St. Albert: 15% (from 1 January 2023) [source]
- Municipal assessment rider, St. Albert: 1.52% (from 1 July 2026) [source]
- Municipal franchise fee, Stony Plain: 20% (from 1 January 2013) [source]
- Municipal assessment rider, Stony Plain: 1.32% (from 1 July 2026) [source]
| Town | Example: one hour | Example: 180 hours |
|---|---|---|
| Calgary | about $0.73 | about $131.54 |
| Edmonton | about $0.73 | about $132.19 |
| Airdrie | about $0.81 | about $145.15 |
| Beaumont | about $0.80 | about $143.86 |
| Cochrane | about $0.80 | about $143.21 |
| Fort Saskatchewan | about $0.75 | about $134.78 |
| Grande Prairie | about $1.04 | about $187.27 |
| Leduc | about $0.80 | about $143.86 |
| Okotoks | about $0.81 | about $145.15 |
| Sherwood Park | about $0.75 | about $134.78 |
| Spruce Grove | about $0.81 | about $145.15 |
| St. Albert | about $0.79 | about $142.56 |
| Stony Plain | about $0.81 | about $145.15 |
Worked out on the default electricity rate and today’s delivery charges and town fees, with GST. Your plan’s energy price will differ.
Tariffs in force on . Rounded estimates of extra use; daily charges are already on the bill.
| Town | Example: one hour | Example: 180 hours |
|---|---|---|
| Calgary | about $0.10 | about $18.27 |
| Edmonton | about $0.10 | about $18.36 |
| Airdrie | about $0.11 | about $20.16 |
| Beaumont | about $0.11 | about $19.98 |
| Cochrane | about $0.11 | about $19.89 |
| Fort Saskatchewan | about $0.10 | about $18.72 |
| Grande Prairie | about $0.14 | about $26.01 |
| Leduc | about $0.11 | about $19.98 |
| Okotoks | about $0.11 | about $20.16 |
| Sherwood Park | about $0.10 | about $18.72 |
| Spruce Grove | about $0.11 | about $20.16 |
| St. Albert | about $0.11 | about $19.80 |
| Stony Plain | about $0.11 | about $20.16 |
Worked out on the default electricity rate and today’s delivery charges and town fees, with GST. Your plan’s energy price will differ.
Tariffs in force on . Rounded estimates of extra use; daily charges are already on the bill.
| Town | Example: one hour | Example: 180 hours |
|---|---|---|
| Calgary | about 20.3 cents | about $36.54 |
| Edmonton | about 20.4 cents | about $36.72 |
| Airdrie | about 22.4 cents | about $40.32 |
| Beaumont | about 22.2 cents | about $39.96 |
| Cochrane | about 22.1 cents | about $39.78 |
| Fort Saskatchewan | about 20.8 cents | about $37.44 |
| Grande Prairie | about 28.9 cents | about $52.02 |
| Leduc | about 22.2 cents | about $39.96 |
| Okotoks | about 22.4 cents | about $40.32 |
| Sherwood Park | about 20.8 cents | about $37.44 |
| Spruce Grove | about 22.4 cents | about $40.32 |
| St. Albert | about 22.0 cents | about $39.60 |
| Stony Plain | about 22.4 cents | about $40.32 |
Worked out on the default electricity rate and today’s delivery charges and town fees, with GST. Your plan’s energy price will differ.
Tariffs in force on . Rounded estimates of extra use; daily charges are already on the bill.
| Town | Example: one hour | Example: 180 hours |
|---|---|---|
| Calgary | about $0.17 | about $30.69 |
| Edmonton | about $0.17 | about $30.84 |
| Airdrie | about $0.19 | about $33.87 |
| Beaumont | about $0.19 | about $33.57 |
| Cochrane | about $0.19 | about $33.42 |
| Fort Saskatchewan | about $0.17 | about $31.45 |
| Grande Prairie | about $0.24 | about $43.70 |
| Leduc | about $0.19 | about $33.57 |
| Okotoks | about $0.19 | about $33.87 |
| Sherwood Park | about $0.17 | about $31.45 |
| Spruce Grove | about $0.19 | about $33.87 |
| St. Albert | about $0.18 | about $33.26 |
| Stony Plain | about $0.19 | about $33.87 |
Worked out on the default electricity rate and today’s delivery charges and town fees, with GST. Your plan’s energy price will differ.
Tariffs in force on . Rounded estimates of extra use; daily charges are already on the bill.
| Town | Example: one hour | Example: 30 days |
|---|---|---|
| Calgary | about $0.01 | about $2.92 |
| Edmonton | about $0.01 | about $2.94 |
| Airdrie | about $0.01 | about $3.23 |
| Beaumont | about $0.01 | about $3.20 |
| Cochrane | about $0.01 | about $3.18 |
| Fort Saskatchewan | about $0.01 | about $3.00 |
| Grande Prairie | about $0.02 | about $4.16 |
| Leduc | about $0.01 | about $3.20 |
| Okotoks | about $0.01 | about $3.23 |
| Sherwood Park | about $0.01 | about $3.00 |
| Spruce Grove | about $0.01 | about $3.23 |
| St. Albert | about $0.01 | about $3.17 |
| Stony Plain | about $0.01 | about $3.23 |
Worked out on the default electricity rate and today’s delivery charges and town fees, with GST. Your plan’s energy price will differ.
Tariffs in force on . Rounded estimates of extra use; daily charges are already on the bill.
| Town | Week example |
|---|---|
| Calgary | about $32.76 |
| Edmonton | about $32.93 |
| Airdrie | about $36.15 |
| Beaumont | about $35.83 |
| Cochrane | about $35.67 |
| Fort Saskatchewan | about $33.57 |
| Grande Prairie | about $46.64 |
| Leduc | about $35.83 |
| Okotoks | about $36.15 |
| Sherwood Park | about $33.57 |
| Spruce Grove | about $36.15 |
| St. Albert | about $35.51 |
| Stony Plain | about $36.15 |
Worked out on the default electricity rate and today’s delivery charges and town fees, with GST. Your plan’s energy price will differ.
Tariffs in force on . Rounded estimates of extra use; daily charges are already on the bill.
The table prices extra use. Daily charges are already on your bill. Read how the full cost per kWh is worked out and compare other appliance running costs.
NRCan’s national residential total for space cooling is 37.3 PJ (read 21 October 2026) [source]. This is Canada-wide and covers all fuels. It does not predict the cooling share of an Alberta electricity bill.
Air conditioner watts from the label
Air conditioner watts come from the label. You can also divide cooling output by the stated efficiency rating. Natural Resources Canada defines the link between output and electrical input. Use the EnerGuide label and rating plate for your unit. A label estimate cannot tell you its draw on every hot afternoon.
NRCan’s older guide defines EER by dividing the cooling output of the unit (read 30 October 2026) [source], in Btu/h, by electrical input in watts. Rearranged, watts = Btu/h ÷ rating. SEER is a seasonal average based on a climate with an average summer temperature of 28°C (read 30 October 2026) [source]. SEER and SEER 2 describe seasonal performance; CEER is a combined label figure. Each estimate is not a measured draw. On a hot afternoon, actual input can be higher.
For illustration
For the central example, 36,000 Btu/h ÷ 13.4 (read 30 October 2026) [source] gives about 2,690 W, rounded to the nearest 10 W. Divide by 1,000 to get about 2.69 kW. The same label-based method supplies the window and heat pump examples.
The central minimum covers ordinary single-phase split systems. It excludes space-constrained and small-duct high-velocity units.
For illustration
The central rule applies to units made on or after 1 January 2023. The heat pump rule applies from 1 January 2025, with the same exclusions. The window rule applies to units made on or after 26 May 2026. It covers louvred units without reverse cycle in the 8,000 to 13,999 Btu/h range. An earlier window unit can carry an older, lower rating. Read its EnerGuide label.
For a portable unit or an older window unit, read the watts printed on the rating plate. Use those watts and your running hours in the same calculation.
NRCan’s room-sizing rule is 200 (read 30 October 2026) [source] Btu/h per square metre. Adjust it for the room’s conditions. NRCan says to choose a unit that is the right size for your space (read 30 October 2026) [source]. A unit that is too large can cool before removing enough moisture.
Heat pumps and central air in cooling mode
A heat pump and central air both use electricity to move heat out of a home. Natural Resources Canada sets minimum cooling ratings for each. The real comparison depends on the label, size and running hours. A heat pump also heats. The cooling table makes no claim about heating costs.
The minimum cooling rating for the covered heat pumps is 14.3 (read 30 October 2026) [source]. For central air, it is 13.4 (read 30 October 2026) [source]. The heat pump rule includes non-ducted mini-splits. These minimums are close, but neither is your unit’s measured draw. Compare labels at the same cooling capacity before drawing a cost conclusion.
A fan’s running cost
A fan’s running cost comes from its watts and hours of use. AESO includes ceiling fans in its summer conservation tips. Read your fan’s label and count the hours you use it. The table uses a chosen wattage to show the method. Your own fan may draw a different amount.
For illustration
The 60 W example uses 0.06 × 1 = 0.06 kWh per hour. Over 8 hours a day for 30 days, it uses about 14.4 kWh. Multiply your own watts by hours and divide by 1,000.
Read the watts on your fan’s label. AESO’s tip is Use ceiling fans to maintain consistent temperature (read 30 October 2026) [source].
A heat wave raises electricity use
A heat wave raises electricity use when cooling runs for more hours. The Alberta Utilities Commission says the default energy rate is fixed for two years. That price stays put within its term while extra use raises the bill. A floating plan follows the market. A grid alert is not a price change.
For illustration
The heat-wave week example runs the central unit for 12 hours a day for 5 days. About 2.69 kW × 12 × 5 = 161.4 kWh. That doubles the cooling use compared with running six hours a day over those days. It is the whole cooling load for those days, not an extra charge on top of the monthly example.
For illustration
That week costs about $32.76 in Calgary and about $32.93 in Edmonton on the default rate. The figures include delivery, town fees and GST.
The default-rate term is set out by the Alberta Utilities Commission: The default rate is fixed for two years starting 1 January 2025; changes between terms cannot normally exceed 10 per cent. (from 1 January 2025) [source]. Read how fixed and floating prices differ. This example makes no prediction about market prices in a heat wave.
AESO’s summer peak hours are 5:00 - 9:30 p.m. (read 30 October 2026) [source]. Its advice includes Reduce air conditioning (read 30 October 2026) [source]. Follow current conservation requests and read about Alberta grid alerts and conditions.
Lowering the cost of cooling
Lowering the cost of cooling starts with the hours and power your unit needs. Natural Resources Canada advises choosing a higher thermostat setting within your comfort range. AESO says to block summer sun with blinds. Read your unit’s care instructions and keep up with filter and coil maintenance.
NRCan’s older guide gives a central thermostat range of 22–25°C (read 30 October 2026) [source] and a usual room-unit setting of 25.5°C (read 30 October 2026) [source]. A higher comfortable setting lowers cooling costs. Follow health needs when choosing your setting.
AESO’s shading tip is Adjust curtains or blinds to block sunlight in summer (read 30 October 2026) [source]. NRCan’s older guide says to clean air filters and maintain coils. Follow the equipment maker’s schedule. Use your label and actual hours to see how each change affects use.
A bill check, free during our launch
BillRobin is an Alberta service. We compare every plan we can confirm for your home, show them in order of estimated cost, and you decide. We never switch your plan, never phone you and never ask for banking details or a social insurance number.
Questions people ask
Is air conditioning expensive to run?
Air conditioning can be expensive to run. A large unit costs more when it runs for long hours. A guide published by Natural Resources Canada explains how cooling output and efficiency relate to power use. Read your unit’s label. Multiply its power by running hours, then use your town’s full electricity cost to budget.
How much does it cost to keep an AC running all night?
Keeping an AC running all night adds electricity use. Cost depends on power draw and running time. A guide published by Natural Resources Canada explains the link between cooling output and power input. Count the hours the unit runs. A thermostat can cycle it off. Use your label and town’s charges for an estimate.
Does a bigger air conditioner cost more to run?
A bigger air conditioner can cost more to run. Power draw and running hours decide the cost. A guide published by Natural Resources Canada warns that bigger is not always better. An oversized room unit may cool before removing enough moisture. Size it for the room and compare the labels before buying.
Does electricity cost more in a heat wave?
Electricity does not cost more on the default rate during a heat wave. The Alberta Utilities Commission says that energy rate is fixed for two years. More cooling still adds use and raises your bill. A floating plan follows the market. Read your contract to find which price applies.
Sources
Written by the BillRobin team. Updated .
Show the 35 sources
- Alberta Electric System Operator: Grid alerts and electricity conservation
- Alberta Utilities Commission: ATCO Electric Ltd., Appendix 1 - Rider A municipal assessment, Rider A Municipal Assessment Surcharge, Table 1: Total Rider A (effective 2026 04 01)
- Alberta Utilities Commission: ATCO Electric Ltd., Appendix 3 - 2026 interim price schedules, effective January 1, 2026
- Alberta Utilities Commission: ATCO Electric Ltd., Quarterly AESO DTS Deferral Account Rider S Application - Q4 2026, effective October 1, 2026
- Alberta Utilities Commission: ATCO Electric Ltd., Rider G Temporary Adjustment, effective January 1, 2026 to December 31, 2026
- Alberta Utilities Commission: AUC Disposition 31030-D01-2026 (September 11, 2026), Appendix 1 - FortisAlberta Inc. 2026 Q4 QTAR filing, Rider Schedules (Quarterly Transmission Adjustment Rider)
- Alberta Utilities Commission: AUC Disposition 31032-D01-2026 (September 11, 2026), Appendix 1 - EPCOR Distribution & Transmission Inc. Rider K, Transmission Charge Deferral Account True-Up Rider (Short-Term Adjustment, effective October 1, 2026)
- Alberta Utilities Commission: Direct Energy Regulated Services, 2026 Final Rate Schedules for Electricity RRT Service, effective July 1, 2026 (Appendix 3 - Direct Energy 2026 final regulated rate tariff schedules, 2024-2026 Deferral Account Disposition)
- Alberta Utilities Commission: ENMAX Energy Corporation, Regulated Rate Tariff: 2025 Non-Energy Interim Rates, Appendix 2 - 2025 interim rate schedule (Rate Schedule applicable to Regulated Rate Tariff Customers within the City of Calgary)
- Alberta Utilities Commission: ENMAX Power Corporation, Appendix 3 - 2026 interim rate schedule, rates in effect as of January 1, 2026
- Alberta Utilities Commission: ENMAX Power Corporation, Quarterly Transmission Access Charge ("TAC") Adjustment Rider, effective October 1, 2026
- Alberta Utilities Commission: ENMAX Power Corporation, Rider F, 2026 Balancing Pool Allocation Rider, effective January 1, 2026
- Alberta Utilities Commission: EPCOR Distribution & Transmission Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 Interim distribution access service rates (DT - Schedule 1, Distribution Access Service Tariff, effective January 1, 2026)
- Alberta Utilities Commission: EPCOR Distribution & Transmission Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 4 - 2026 Interim system access service rates (DT - Schedule A, effective January 1, 2026)
- Alberta Utilities Commission: EPCOR Distribution & Transmission Inc., Appendix 10 - Rider J, SAS True-Up Rider (Interim Adjustment, effective January 1, 2026)
- Alberta Utilities Commission: EPCOR Distribution & Transmission Inc., Appendix 9 - 2026 Balancing Pool Rider G (Temporary Adjustment, effective January 1, 2026)
- Alberta Utilities Commission: EPCOR Energy Alberta GP Inc., Price Schedule Applicable to Regulated Rate Tariff Customers Outside the City of Edmonton (EEA Regulated Rate Tariff, FortisAlberta Inc.), effective July 1, 2026 (Appendix 5 - Fortis price schedule July 1, 2026, 2025-2027 Non-Energy Regulated Rate Tariff Compliance Filing)
- Alberta Utilities Commission: EPCOR Energy Alberta GP Inc., Price Schedule Applicable to Regulated Rate Tariff Customers within the City of Edmonton (EEA Regulated Rate Tariff, EPCOR Distribution & Transmission Inc.), effective July 1, 2026 (Appendix 3 - EDTI price schedule July 1, 2026, 2025-2027 Non-Energy Regulated Rate Tariff Compliance Filing)
- Alberta Utilities Commission: FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026)
- Alberta Utilities Commission: FortisAlberta Inc., Appendix 1 - Municipal Assessment Rider A-1, 2026 Rate Sheets (Rider A-1 effective July 1, 2026)
- Alberta Utilities Commission: FortisAlberta Inc., Appendix 1 - Municipal franchise fee riders (Rates, Options and Riders Schedules, effective May 1, 2026)
- Alberta Utilities Commission: What is the Rate of Last Resort?
- assets.enmax.com: ENMAX Energy Corporation, Regulated Rates 2024 - 2026 (Calgary, Red Deer, Ponoka, Cardston)
- The City of Calgary, Energy costs page
- EPCOR Distribution & Transmission Inc., Schedule - Franchise Fee Rates (Local Access Fee), effective January 1, 2026
- EPCOR, Rate of Last Resort (Edmonton)
- Natural Resources Canada: Air Conditioning Your Home
- Natural Resources Canada: Ceiling fans and ceiling fan light kits
- Natural Resources Canada: Portable air conditioners: July 2022 technical bulletin
- Natural Resources Canada: Residential Secondary Energy Use by Energy Source and End Use
- Natural Resources Canada: Room air conditioners
- Natural Resources Canada: Split-system central air conditioners
- Natural Resources Canada: Split-system central heat pumps
- Natural Resources Canada: Your guide to room air conditioners
- www.directenergy.ca: Direct Energy Regulated Services, Residential Electricity Rates
https://billrobin.com/ca/en/alberta/energy/air-conditioning-cost?utm_medium=share&utm_source=page
Are you on the right energy plan?
Send your bills as PDFs. We compare the plans available at your address, and you decide. Free during our launch.
Check my bills, free- We never phone you
- We never switch your plan. You decide.