FortisAlberta and ATCO Electric own the local wires. They bill your retailer, which passes the regulated charges to you. The AUC approves rates; the UCA explains delivery. You pay daily charges, distribution and transmission per kWh, riders and town fees. You cannot choose the wires company. Switching retailers leaves these rates unchanged.
Your retailer collects the delivery charges
Your retailer collects the delivery charges for the wires at home. ATCO Electric’s terms say it bills the retailer. FortisAlberta’s sample bill shows these costs apart from the power you buy. The bill comes from your retailer. You still pay for the same wires when you choose a new plan.
ATCO Electric bills the retailer for electric distribution services. Its retailer terms also allow it to bill a customer directly for some amounts under the customer terms. (read 30 October 2026) [source]
The default electricity retailer in the EPCOR Distribution (Edmonton) and FortisAlberta areas is EPCOR. (read 15 October 2026) [source] The default electricity retailer in the ATCO Electric area is Direct Energy Regulated Services. It is also the default natural gas retailer for ATCO Gas. (read 15 October 2026) [source]
The lines in FortisAlberta Rate 11
FortisAlberta’s home rate has a daily charge and charges for each kWh you use. Its schedule calls them facilities and service, system usage and transmission. Riders adjust those charges, and town fees add local costs. The AUC approves the schedule. Your retailer may group several lines under one bill heading.
Rate 11 has no demand charge. The daily facilities and service charge is also its distribution minimum charge. (read 30 October 2026) [source] FortisAlberta says retailers may use different names for riders. (read 30 October 2026) [source]
The bill wording below comes from FortisAlberta’s sample and terminology guide. A bill category can cover several tariff lines. Rider A-1 passes on a property tax set in part by the local taxation authority. (read 30 October 2026) [source]
| As the tariff files it | Published bill wording | What it pays for | Does it change with use | Amount |
|---|---|---|---|---|
| Facilities and Service Charge | Distribution charge - service provided by FortisAlberta | Keeps the local connection ready | No, per day | C$1.034442 per day |
| System Usage Charge | Distribution charge - service provided by FortisAlberta | Builds, runs and maintains the local wires | Yes, per kWh | 3.3477¢ per kWh |
| Variable Charge (Transmission Charges) | Transmission charge | Moves power through the high-voltage grid | Yes, per kWh | 4.2560¢ per kWh |
| Balancing Pool Allocation Rider | Rate Riders | Passes on the Balancing Pool allocation | Yes, per kWh | 0.1198¢ per kWh |
| Quarterly Transmission Adjustment Rider | Rate Riders | Adjusts transmission costs each quarter | Yes, per kWh | 0.0155¢ per kWh |
| Base Transmission Adjustment Rider | Check your retailer’s wording | A credit on the base transmission charge | Yes, with transmission use | -0.59% |
| Rider A-1 Municipal Assessment Rider | A-1 Municipal Assessment Rider | Passes on local property tax | Partly, a percentage | 1.04% |
| Municipal Franchise Fee Rider | Local access fee | Pays the town for the right to use its land | Partly, a percentage | 20% |
Bill wording: Understanding your bill: sample bill; Bill terminology explanation. Tariffs and town fees: FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026); AUC Disposition 31030-D01-2026 (September 11, 2026), Appendix 1 - FortisAlberta Inc. 2026 Q4 QTAR filing, Rider Schedules (Quarterly Transmission Adjustment Rider); FortisAlberta Inc., Appendix 1 - Municipal Assessment Rider A-1, 2026 Rate Sheets (Rider A-1 effective July 1, 2026); FortisAlberta Inc., Appendix 1 - Municipal franchise fee riders (Rates, Options and Riders Schedules, effective May 1, 2026). | ||||
Find the figures and towns on the FortisAlberta distributor page. Read the guide to delivery and riders for the wider picture.
The lines in ATCO Electric D11
ATCO Electric’s home schedule splits delivery into daily charges, use charges and riders. The distribution and service lines each have a daily part. Distribution and transmission also charge for each kWh. The AUC approves these interim home rates. Your retailer’s bill may group them under broader delivery headings.
D11 has no demand charge. The AUC approves these interim 2026 rates. Distribution and service have daily customer charges. Distribution and transmission have energy charges per kWh. (read 30 October 2026) [source]
The bill categories below come from a retailer’s published bill guide. They are broad categories, not a promise of your bill’s exact wording. ATCO Electric’s municipal assessment rider includes franchise fees and property taxes. (read 30 October 2026) [source]
| As the tariff files it | Published bill wording | What it pays for | Does it change with use | Amount |
|---|---|---|---|---|
| Customer Charge: Distribution | Distribution & delivery charges | Keeps the local connection ready | No, per day | C$1.4125 per day |
| Customer Charge: Service | Check your retailer’s wording | The schedule’s separate daily service amount | No, per day | C$0.2698 per day |
| Energy Charge: Distribution | Distribution & delivery charges | Builds, runs and maintains the local wires | Yes, per kWh | 9.03¢ per kWh |
| Energy Charge: Transmission | Transmission charges | Moves power through the high-voltage grid | Yes, per kWh | 4.79¢ per kWh |
| Municipal Assessment (Rider A) | Municipal franchise / local access fees | Passes on property tax and franchise fees | Partly, a percentage | 12.26% |
| Balancing Pool Adjustment (Rider B) | Rate riders & government fees | Passes on the Balancing Pool adjustment | Yes, per kWh | 0.133¢ per kWh |
| Temporary Adjustment (Rider G) | Rate riders & government fees | A temporary credit | Yes, per kWh | -0.212¢ per kWh |
| SAS Adjustment (Rider S) | Rate riders & government fees | Adjusts system access costs each quarter | Yes, per kWh | 0.068¢ per kWh |
Bill wording: Understanding your energy bill. Tariffs and town fees: ATCO Electric Ltd., Appendix 3 - 2026 interim price schedules, effective January 1, 2026; ATCO Electric Ltd., Appendix 1 - Rider A municipal assessment, Rider A Municipal Assessment Surcharge, Table 1: Total Rider A (effective 2026 04 01); ATCO Electric Ltd., Rider G Temporary Adjustment, effective January 1, 2026 to December 31, 2026; ATCO Electric Ltd., Quarterly AESO DTS Deferral Account Rider S Application - Q4 2026, effective October 1, 2026. | ||||
D11 TOTAL PRICE, before riders and town fees: C$1.6823 /day and 13.82 ¢/kW.h. These are delivery rates, not the price of the power you buy. D11 schedule.
D13 time of use is available by request only, at the company’s discretion, with an advanced meter. On peak runs from 4 p.m. to 9 p.m. (read 30 October 2026) [source] ATCO Electric’s PBR Re-Opener Refund, Rider J, ended on 28 February 2026. (read 30 October 2026) [source]
Find the figures and towns on the ATCO Electric distributor page.
A worked month in each town
FortisAlberta and ATCO Electric file different rates with the AUC. The two examples below use the same amount of power and the same number of days. Each shows daily charges, use charges, riders and town fees. These towns are two examples of the tariffs, with no ranking of households.
Rates and riders change, including by quarter. These examples use the rates in force on the date shown. Delivery is the same whichever retailer you pick. The energy part uses each area’s default seller. Your plan may have a different energy price and retailer charge.
The Airdrie example includes the small base transmission credit.
For illustration
Airdrie: FortisAlberta Rate 11
Rates in force on 31 October 2026. For 600 kWh and 365/12 days, about 30.42 days.
| Line | Amount |
|---|---|
| Facilities and Service Charge: C$1.034442 per day (from 1 January 2026) [source] | C$31.46 |
| System Usage Charge: 3.3477¢ per kWh (from 1 January 2026) [source] | C$20.09 |
| Variable Charge (Transmission Charges): 4.2560¢ per kWh (from 1 January 2026) [source] | C$25.54 |
| Balancing Pool Allocation Rider: 0.1198¢ per kWh (from 1 January 2026) [source] | C$0.72 |
| Quarterly Transmission Adjustment Rider: 0.0155¢ per kWh (1 October 2026 to 31 December 2026) [source] | C$0.09 |
| Base Transmission Adjustment Rider credit: -0.59% (from 1 January 2026) [source] | -C$0.15 |
| Rider A-1 Municipal Assessment Rider: 1.04% (from 1 July 2026) [source] | C$0.80 |
| Municipal Franchise Fee Rider: 20% (from 1 April 2021) [source] | C$15.42 |
| Delivery including riders and town fees, before GST | C$93.97 |
| GST on delivery | C$4.70 |
| Delivery including GST | C$98.66 |
| Town fees including GST, already included above | C$17.03 |
| Default energy, before GST: 12.01¢ per kWh (1 January 2025 to 31 December 2026) [source] | C$72.06 |
| Default retailer’s charge, before GST: C$0.260 per day (from 1 July 2026) [source] | C$7.91 |
| GST on energy and the retailer’s charge | C$4.00 |
| Energy and retailer’s charge including GST | C$83.97 |
For illustration
Grande Prairie: ATCO Electric D11
Rates in force on 31 October 2026. For 600 kWh and 365/12 days, about 30.42 days.
| Line | Amount |
|---|---|
| Customer Charge: Distribution: C$1.4125 per day (from 1 January 2026) [source] | C$42.96 |
| Customer Charge: Service: C$0.2698 per day (from 1 January 2026) [source] | C$8.21 |
| Energy Charge: Distribution: 9.03¢ per kWh (from 1 January 2026) [source] | C$54.18 |
| Energy Charge: Transmission: 4.79¢ per kWh (from 1 January 2026) [source] | C$28.74 |
| Municipal Assessment (Rider A): 12.26% (from 1 April 2026) [source] | C$16.44 |
| Balancing Pool Adjustment (Rider B): 0.133¢ per kWh (1 January 2026 to 31 December 2026) [source] | C$0.80 |
| Temporary Adjustment (Rider G) credit: -0.212¢ per kWh (1 January 2026 to 31 December 2026) [source] | -C$1.27 |
| SAS Adjustment (Rider S): 0.068¢ per kWh (1 October 2026 to 31 December 2026) [source] | C$0.41 |
| Delivery including riders and town fees, before GST | C$150.46 |
| GST on delivery | C$7.52 |
| Delivery including GST | C$157.99 |
| Town fees including GST, already included above | C$17.26 |
| Default energy, before GST: 12.02¢ per kWh (1 January 2025 to 31 December 2026) [source] | C$72.12 |
| Default retailer’s charge, before GST: C$0.558 per day (1 July 2026 to 31 December 2026) [source] | C$16.97 |
| GST on energy and the retailer’s charge | C$4.45 |
| Energy and retailer’s charge including GST | C$93.55 |
Read the local pages for Airdrie and Grande Prairie. Town fees are explained in local access and franchise fees.
Rural homes share longer lines
Rural delivery costs more because homes are far apart. The Utilities Consumer Advocate points to low population density and longer distances between sites. More wires serve fewer homes, so each home bears more of the network cost. Switching retailers leaves that network and its regulated delivery rates the same.
The UCA describes “low population density and longer distances between consumer sites”. Distribution charges are higher in rural Alberta than in urban areas because of low population density and longer distances between customer sites. (from 1 January 2026) [source]
These are the UCA’s historic figures, not the current tariff examples above. In 2025, for 600 kWh, monthly distribution charges ranged from $31.55 (in EPCOR's service area) to $97.89 (in ATCO’s service area), according to the Utilities Consumer Advocate. (1 January 2025 to 31 December 2025) [source] In 2025, for 600 kWh, monthly transmission charges ranged from $23.93 (in ENMAX's service area) to $26.32 (in ATCO Electric's service area), according to the Utilities Consumer Advocate. (1 January 2025 to 31 December 2025) [source]
The examples also reflect different distribution tariffs. FortisAlberta’s daily line is C$1.034442 per day (from 1 January 2026) [source] and its use line is 3.3477¢ per kWh (from 1 January 2026) [source]. ATCO Electric’s daily distribution line is C$1.4125 per day (from 1 January 2026) [source], plus service of C$0.2698 per day (from 1 January 2026) [source]. Its distribution use line is 9.03¢ per kWh (from 1 January 2026) [source].
Read how transmission, distribution and riders fit together.
Using less lowers the lines charged per kWh
Using less power lowers the lines charged per kWh. The daily lines stay due for each day of service. The Rate 11 and D11 schedules list these daily charges and charges based on use. A retailer switch changes none of these delivery rates. Your power use still affects the total.
ATCO Electric’s time of use option is available by request. Whether it costs less depends on when you use power. Ask your retailer to explain a disputed line. Read who to contact about an energy bill complaint if it remains unresolved.
Read about fixed charges and a high utility bill.
A bill check, free during our launch
BillRobin is an Alberta service. We compare every plan we can confirm for your home, show them in order of estimated cost, and you decide. We never switch your plan, never phone you and never ask for banking details or a social insurance number.
Questions people ask
What is the distribution charge on my ATCO Electric bill?
The distribution charge on an ATCO Electric bill pays for the local wires that bring power to your home. The Utilities Consumer Advocate explains that role. ATCO Electric lists both a daily charge and a charge based on use. Your retailer collects them on your bill.
Why is there a FortisAlberta charge on my EPCOR bill?
A FortisAlberta charge on your EPCOR bill pays for the wires at home. The sample bill splits those costs from the power you buy. EPCOR is the default seller in this area. You can choose a new plan. The same wires and rates still serve your home.
Is there a demand charge on a home electricity bill in Alberta?
FortisAlberta Rate 11 and ATCO Electric D11 list no demand charge. Their home rate schedules charge by the day and by the power used. This statement covers those two rates only. The AUC approves the schedules. Other rate classes can have different terms and charges.
Do FortisAlberta and ATCO Electric bill me directly?
FortisAlberta and ATCO Electric charges come through your retailer’s bill. ATCO Electric’s terms say it bills the retailer for the wires. It may also bill a customer directly for some amounts. That is a separate rule. It does not mean the company sends your monthly bill.
Why are my delivery charges higher in the country?
Delivery charges are higher in the country because homes are far apart. The UCA says low population density and long lines raise costs. More wires serve fewer homes. Each home pays a share of those costs. A new plan leaves the same wires and delivery rates in place.
Sources
Written by the BillRobin team. Updated .
Show the 11 sources
- Alberta Utilities Commission: ATCO Electric Ltd., Appendix 3 - 2026 interim price schedules, effective January 1, 2026
- Alberta Utilities Commission: FortisAlberta Inc., 2026 Annual Performance-Based Regulation Rate Adjustment, Appendix 3 - 2026 interim rate schedule (Interim Rates, Options and Riders Schedules, January 1, 2026)
- Alberta Utilities Commission: Rate riders
- ATCO Electric: Retailer terms, section 7.1
- ATCO Energy: Understanding your energy bill
- FortisAlberta: Bill terminology explanation
- FortisAlberta: Rates, options and riders effective October 2026
- FortisAlberta: Understanding your bill
- Utilities Consumer Advocate: Default rates
- Utilities Consumer Advocate: Distributor details
- Utilities Consumer Advocate: Residential electricity delivery charges
https://billrobin.com/ca/en/alberta/energy/fortisalberta-and-atco-electric-delivery-charges?utm_medium=share&utm_source=page
Are you on the right energy plan?
Send your bills as PDFs. We compare the plans available at your address, and you decide. Free during our launch.
Check my bills, free- We never phone you
- We never switch your plan. You decide.